Seventy 01 Condos (reclad)

IMG_4064b.jpg

The old stucco was 45 years old and leaking into the wall and deck framing.   After competitively pricing and interviewing for contractors, the HOA hired PBE  to replace their worn out cladding system with new Hardie siding, VPI windows, new deck doors and coatings with glass railings.   We also fully waterproofed their common area courtyard which was the equivalent to two football fields in size.  All landscaping and topsoil in this area was replaced to allow for the new waterproofing all while the building was occupied.

Scope of Work

  • Replacement of stucco and wood cladding with James Hardie Lap siding over rain-screen on three buildings, 151 units

  • Replacement of all windows and doors

  • Deck framing, flashing and waterproofing

  • Aluminium deck railings at unit decks with glass panels

  • New entry framing with stairs, roofs and rails

  • Courtyard waterproofing, landscaping and irrigation